Faringdon
- Rolleston
ROADING - DRAINAGE - EARTHWORKS - SURVEYING - SUBDIVISIONS - SEWER TREATMENT
Client: Hughes Developments Ltd
Website: www.faringdon.co.nz
Consultant: Davie Lovell Smith (Andy Hall)
Time Frame: 7 years (ongoing)
Size: 1826 Lots so far
A premier multi stage residential subdivision in Rolleston including 1800+ lots, external roading upgrades and utilities link to existing off site services.
The key achievements of this project are:
Currently delivering a section per day.
All Enable Fibre installed by BGCL Staff.
All aggregates were crushed on site.
All material was contained on site.
Multiple stages progressing simultaneously
Highly level of collaboration with key Stake holders to achieve timely delivery
Updated Feb 2021
Earthworks: 1.09 million cubic metres
Sanitary Sewer: 26km of Sewer Main
Stormwater: 4690m of Stormwater sump leads
High Pressure Water: 37km of Water Mains
Pump Station: 2 x Pump Stations
Roading and Footpaths: 22.1 ha of Roads