Faringdon
- Rolleston

ROADING - DRAINAGE - EARTHWORKS - SURVEYING - SUBDIVISIONS - SEWER TREATMENT

  • Client: Hughes Developments Ltd

  • Website: www.faringdon.co.nz

  • Consultant: Davie Lovell Smith (Andy Hall)

  • Time Frame: 7 years (ongoing)

  • Size: 1826 Lots so far

A premier multi stage residential subdivision in Rolleston including 1800+ lots, external roading upgrades and utilities link to existing off site services.

The key achievements of this project are:

    • Currently delivering a section per day.

    • All Enable Fibre installed by BGCL Staff.

    • All aggregates were crushed on site.

    • All material was contained on site.

    • Multiple stages progressing simultaneously

    • Highly level of collaboration with key Stake holders to achieve timely delivery

Updated Feb 2021

Earthworks: 1.09 million cubic metres

Sanitary Sewer: 26km of Sewer Main

Stormwater: 4690m of Stormwater sump leads

High Pressure Water: 37km of Water Mains

Pump Station: 2 x Pump Stations

Roading and Footpaths: 22.1 ha of Roads