Faringdon Westwood
ROADING - DRAINAGE - EARTHWORKS -
SURVEYING - SUBDIVISIONS - SEWER TREATMENT
Client: Hughes Developments Ltd
Website: www.faringdon.co.nz
Consultant: Davie Lovell-Smith
Time Frame: 65 Weeks
Size: 481 Lots - 1.48 lots per day
A premier multistage residential subdivision in Rolleston including 481 lots and a future commercial block, external roading upgrades and utilities link to existing off-site services. 54 Hectares, including all tree removal, land remediation, waste removal and structure removal
The key achievements of this project are: Open trenching up to 5m deep for gravity sewer Currently delivering over a section per day. All Enable Fibre installed by BGCL Staff. 50% of all aggregates were crushed on site. All material was contained on site. Multiple stages progressing simultaneously.
Earthworks: 217,822m3
Sanitary Sewer: 16.17km including laterals and pressure mains
Stormwater: 1903m pipe, 151 sumps, 57 soakpits
High Pressure Water: 12,917m
Pump Station: 1 X wet well pump station plus 3 x storage tanks with a volume of 500,000m3
Roading and Footpaths: 58,079m2 roading, 15,008m2 footpath, 16,157m of kerb
Services: 15,402m of trench, 12,957m of ENABLE installed
Landscaping: Multiple garden beds and hundreds of tree pits
Subcontractors: Fulton Hogan, Asphalt Contractors, Southern Screenworks, North Canterbury Rutbusters, Mainland Pipeline Inspections, Kennards Hire, Wilsons Traffic Management
Challenges: Dewatering for the first time in 11 years of constructing the Faringdon Development